SOAR WORKS, Sheffield / by Nick Ierodiaconou

We have been very busy with SOAR Works (a 3600m2 new build community enterprise centre)  on site these last few months. Here are a few photos showing the building coming together, from seeing the steel frame in the fabrication shop, to being craned into position, and then bolted and welded on site. With all the steel frame erected, you really get an impression of the scale of the building. Floor slabs have been cast into the metal decking and internal walls are well underway – the internal rooms are taking shape

The progress on site has been very visual over the last few weeks with windows and glass panels going in. Photos to be posted shortly. SH